Scrum: Product backlog - Sprint backlog - Done

| | Comments (0) | TrackBacks (0)

I've made this interesting picture about Scrum. It shows the product backlog, product owner, sprint backlog, team and definition of "done" in one clear picture.

I think I'll make it in a powerpoint and add to my standard training material.

Problem_Solution_Done

0 TrackBacks

Listed below are links to blogs that reference this entry: Scrum: Product backlog - Sprint backlog - Done.

TrackBack URL for this entry: http://www.odd-e.com/cgi-sys/cgiwrap/basv/managed-mt/mt-tb.cgi/692

Leave a comment

About this Entry

This page contains a single entry by Bas Vodde published on November 14, 2006 1:55 PM.

Weird TDD report was the previous entry in this blog.

Dear XP -> Japanese song about XP is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Powered by Movable Type 4.01